MENU

Social Channels

SEARCH ARCHIVE

  • Type

  • Topic

  • Sort

Coal fired electric power plant in India
Coal fired electric power plant in India. Credit: DB Images / Alamy Stock Photo.
GUEST POSTS
14 September 20210:01

Guest post: How world’s coal-power pipeline has shrunk by three-quarters

Multiple Authors

09.14.21
Guest posts Guest post: How world’s coal-power pipeline has shrunk by three-quarters

There is now a broad consensus thatunabatedcoal power generation must be rapidly phased out if the goals of the 2015Paris Agreementare to be met.

TheIntergovernmental Panel on Climate Change(IPCC) sees coal usefallingby around four-fifths this decade on a 1.5C pathway. TheInternational Energy Agencyroadmap for 1.5C says unabated coal power shouldend by 2030in advanced economies and by 2040 globally.

A pivotal first step is ensuring no new coal-fired power stations are built. UN secretary general António Guterres iscalling foran end to their construction after this year and COP26 president designate Alok Sharmawantsthe summit in Glasgow to “consign coal power to history”.

Innew analysis今天发布,我们表明,全球pipeline of new coal plant projects has already shrunk dramatically since 2015, bringing the world closer to a pathway consistent with international climate goals.

To date, 44 governments have committed to end the construction of coal plants. A further 33 countries have cancelled their project pipelines since 2015 and are in a position to make a formal “no new coal” pledge, alongside seven more with no plans to replace their coal fleets.

The remaining pre-construction pipeline is spread across a further 37 countries, 16 of which have just one project. Just six countries account for more than four-fifths of proposed coal plants, namely China, India, Vietnam, Indonesia, Turkey and Bangladesh.

Most of these six are reducing but not ending their plans, our analysis shows. If any were to commit to no new coal, it would radically reduce the global pipeline of new projects.

Collapsing pipeline

Back in 2015, when the world’s governments negotiated the Paris Agreement, there was a total of 1,553 gigawatts (GW) of coal capacity in the global pipeline, our analysis finds.

This total, shown on the left in the chart below, includes plants under construction or in earlier stages of development. Since 2015, the pre-construction pipeline has collapsed by 76% to 297GW, with just 185GW under construction as of July 2021 (right-hand pie).

Left: The global pipeline of coal capacity under construction (red wedges) or in earlier stages of development (permitted, orange; pre-permit, yellow; and announced, blue) as of July 2015 (left-hand pie chart) compared with July 2021 (right-hand), in gigawatts. Right: The global cumulative total of coal capacity built (blue) or cancelled (grey) since 2015, gigawatts. Source: E3G, Global Energy Monitor and Ember (2021).

Globally, 1,175GW of planned projects have been cancelled since 2015. Accelerating market trends have combined with new government policies and sustained civil society opposition to coal. The world has avoided a 56% expansion of the total global coal fleet (as of June 2021), which would have been equivalent to adding a second China (1,047GW) to global coal capacity.

The cancelled capacity is 3.6 times more than the 327GW that has gone into operation over the same period, meaning plants in the pipeline have been more likely to be scrapped than built.

The Sankey chart below visually conveys the scale of cancellations since Paris (dark grey chunks) relative to what has started operating (dark blue) or entered construction (red).

Changes in the status of coal projects under development around the world 2015-2021, gigawatts. Reading from top to bottom, the diagram shows projects that have been cancelled (dark grey), announced (light blue), shelved (light grey), pre-permit (yellow), with government permits (orange), entering construction (red), starting to operate (dark blue) or retiring (green). Note that the graphic does not include projects whose status was unchanged during the period. Source: E3G, Global Energy Monitor and Ember (2021).

Our analysis breaks the global coal landscape into three constituent regions, each manifesting different forms of the current internationalstructural shiftaway from coal.

The first region is theOECDgroup of market economies and the EU, where very few new coal plants are planned and countries are engaged inaccelerating retirementsof their existing fleets.

The second is China, which accounts for both half the world’s operating fleet and half the world’s project pipeline. Finally, the rest of the world is seeing its pipeline rapidly contract as countries pivot away from coal, but still accounts for 39% of the global pipeline.

看着这些地区in turn, the 38-strongOECDgroup of market economies and EU28 have continued to move away from coal, with the dynamic across most of these countries now moving towardsaccelerated retirements.

Only five of these countries are bucking the group trend and still considering building new coal, namely Australia, Colombia, Mexico, Poland and Turkey.

Projects nominally still in the pipeline for the first four of these countriesare unlikely to proceed.

Turkey accounts for nearly three-quarters of the OECD total, with a pipeline of 12GW. In spite of a majorcoal push since 2015, however, its pipeline has also been contracting rapidly and is now 64% smaller than it wasin 2018. Some 8GW wascancelledin the first half of 2021 alone.

Fearsof the impact of a potential Europeancarbon border adjustment mechanism(CBAM) and climate-exacerbatedwildfiresare increasingpressureto cancel the country’s remaining pipeline and explore alternatives.

China is a constituent bloc in its own right. However, even with itscontinued pursuit of coal, its pipeline is now 74% smaller, including 484GW of planned capacity that has been cancelled since Paris – more than double the amount that went into operation over that period (198GW).

Turning to the third grouping of non-OECD countries excluding China, the pre-construction pipeline has collapsed by 77% since 2015, with five times as much coal power capacity having been scrapped (552GW) as commissioned (105GW).

No new coal

The shift in coal dynamics means that fewer and fewer countries have new coal plants under development – and an increasing list are making this into a formal “no new coal” commitment.

The chart below shows the number of countries considering coal plants at each stage of development on the y-axis, as an alternative way illustrating the shrinking global coal pipeline.

For example, in 2015 there were 26 non-OECD countries with coal plants under construction, amounting to a total capacity of 123GW (red line, left panel). By 2021, this had fallen to just 14 countries building a total of 72GW of new coal capacity.

燃煤电厂在每个阶段的国家的数量of development, including those announced (blue line), at the pre-permit stage (yellow), permitted (orange) or under construction (red). Source: E3G, Global Energy Monitor and Ember (2021).

Similarly, the chart above shows that 11 countries from the OECD or EU28 were building 28GW of coal capacity in 2015 and this had fallen to five countries and 16GW by 2021 (right panel), namely Japan, Turkey, Poland, South Korea and Greece. (Notably,Greeceand South Korea are now bothconsideringconverting their unfinished coal plants to gas.)

To date, ouryabo亚博体育app下载finds that 44 governments have committed to not pursue any new coal plants, many through joining thePowering Past Coal Alliance.

Others have made the move independently, with Sri Lanka making an explicit “no new coal” commitment in its2021 Paris pledge(“nationally determined contribution”) andMalaysia’sEnergy Transition Plan2021-2040 including a commitment to not build new coal.

A further 40 countries have the opportunity to formalise the facts on the ground by making their own “no new coal” commitments. Some 33 have cancelled their remaining project pipelines, while 7 have no plans for new coal. This group includes 32 non-OECD countries that have pivoted away from coal, showing the global expansion of this trend.

Six coal countries

The remaining pipeline of pre-construction coal power projects still under development amounts to 297GW of capacity spread across a total of 37 countries. Yet in reality, this pipeline is highly concentrated in just six countries.

As of July 2021, these countries account for more than four-fifths (82%) of the remaining development pipeline, namely China, India, Vietnam, Indonesia, Turkey and Bangladesh. This is shown in the donut chart below (shades of red).

Share of the pre-construction pipeline of coal power projects under development in six key countries (shades of red) relative to the rest of the world (grey). Source: E3G, Global Energy Monitor and Ember (2021).

The situation in China and Turkey is described briefly above. Taking the others in turn, India is currently constructing 34GW of new coal capacity, more than the next seven countries combined, while its pre-construction pipeline of 21GW is the second largest in the world. This is on top of India’s considerable existing operating fleet of 233GW (11% of the global total).

Yet since 2015, India has seen over 326GW of projects cancelled, a 92% decrease in the pipeline. This includes more than 250GW of capacity that had previously been shelved. This means that almost 7GW have been scrapped for every 1GW that has gone into operation.

Expert analysis direct to your inbox.

Get a round-up of all the important articles and papers selected by Carbon Brief by email. Find out more about our newslettershere.

The remaining development pipeline in India is also facing a formidable set of headwinds, includinglower than expectedpower demand growth, cheaper renewables, fallingload factorsanddifficultyin securing finance.

Bangladesh has also seen its pipeline collapse from over20GW in 2018to 10GW today. This collapse includes10 plants scrappedin the first half of 2021 alone, due toconcernsabout fuel costs, overcapacity and limited land availability, as well as the increasingly challenging task ofattracting finance.

Bangladesh’s role as chair of theClimate Vulnerable Groupof countries was alsoreportedlya factor in its decision to scrap the coal plants, highlighting the fact that some developing countries are considering their role as greenhouse gas emitters, however modest historically, alongside their position in bearing the brunt of climate change.

Indonesia, home to 4% of the global coal pipeline in 2015, has recentlyannounced its intentionto stop building new coal-fired power plants after 2023, althoughconcerns remainthat it may allow a number of permitted and pre-permit units to go ahead.

Vietnam’s draftEighth Power Development Plan(PDP8) – a government document that sets the country’s energy trajectory out to 2030 – scales back plans for new coal capacity from previous iterations and states thatno new coal-fired power plantswill be built beyond those already under construction or planned for completion by 2025 or sooner.

Because the global distribution of proposed power plants is highly concentrated, firm commitments to “no new coal” by just these six countries would remove 82% of the world’s remaining pipeline, should such pledges be forthcoming.

The remaining pre-construction pipeline of 53GW (18% of the global total) is thinly spread across a further 31countries, shown in the chart below. Nearly half of these countries have less than 1GW under consideration, with 16 of them considering just a single project.

The 17GW of projects that are at the announced stage – the furthest stage from plants going into operation, coloured blue in the chart – are increasingly unlikely to come to fruition now that new coal finance is sodifficult to secure.

Countries with coal capacity under development in the rest of the world, by country, capacity and development status. Source: E3G, Global Energy Monitor and Ember (2021).

Many of the coal projects in these 31 countries arehighly dependenton international public finance to be realised. China is increasingly isolated as the last remaining major provider of public finance for overseas coal projects, followingJapanandSouth Korea’s recent commitments to end coal finance.

An end to Chinese finance wouldopen the doorto the cancellation of over 40GW of pipeline projects in 20 countries, making up the large majority of the 53GW shown in the chart above.

The small scale of proposed coal capacity in these countries means that many of them are well placed to cancel remaining projects, if they wish to join an emerging “no new coal club” ahead of COP26.

However, some countries may needinternational aidto support a commitment to no new coal. This could take the form of provision ofpublic and privateclean energy finance, support to develop flexible grid infrastructure, or technical and capacity assistance to bolster regulatory and policy frameworks that accelerate the transition from coal-to-clean.

The collapse of the global coal pipeline and the rise of commitments to ‘no new coal’ have been progressing hand-in-hand over recent years. Over the past two years alone, countries as diverse as Sri Lanka, Malaysia, Egypt, Pakistan, Philippines, North Macedonia and Montenegro have all made commitments and actions that put them on a pathway to no new coal.

Ahead of COP26, all governments are being asked to collectively respond to UN secretary general Guterres’ call for ‘no new coal by 2021’. Our analysis finds that a growing number of countries are in a position to do so.

Sharelines from this story
  • Guest post: How world’s coal-power pipeline has shrunk by three-quarters

Expert analysis direct to your inbox.

Get a round-up of all the important articles and papers selected by Carbon Brief by email. Find out more about our newslettershere.